The Central Railway Project and its relationship with the UPM 2 company in Uruguay (2018-2021).

Authors

  • Sabina Ximena Inetti Pino Universidad Nacional de Quilmes

DOI:

https://doi.org/10.48160/25913530di15.170

Abstract

This paper analyzes the link between the Central Railway Project and the installation process of the second cellulose plant of the UPM company in Uruguay in the 2018-2021 period. This project uses the original layout of the railway networks of yesteryear and which remain in force to this day. Before, multinational companies wanted to obtain meat, leather and wool, now wood and cellulose pulp, as a strategy of reconfiguration of spaces through infrastructures that can be defined as a form of primitive accumulation to recreate the bases of accumulation properly bliss of the capitalist system.

Downloads

Download data is not yet available.

Author Biography

Sabina Ximena Inetti Pino , Universidad Nacional de Quilmes

Es Profesora de Geografía e Historia egresada del Instituto de Profesores “Artigas”, Uruguay. Máster en Gestión de la Ciencia y la Innovación y Especialista en Gestión de la Investigación y la Transferencia de Conocimiento por la Universidad Politécnica de Valencia, España. Actualmente se encuentra realizando el Doctorado en Ciencias Sociales y Humanas y la Maestría en Desarrollo Territorial y Urbano en la Universidad Nacional de Quilmes, Argentina. Maestría en Estudios Latinoamericanos por la Universidad de la República, Uruguay. Trabaja en Educación Secundaria y en Formación Docente en el Instituto de Profesores “Artigas”. Integrante del Grupo de Estudios sobre Acumulación, Conflicto y Hegemonía (GEACH-UNQ). 

Published

2021-08-31

How to Cite

Inetti Pino , S. X. . (2021). The Central Railway Project and its relationship with the UPM 2 company in Uruguay (2018-2021). Divulgatio. Academic Postgraduate Profiles, 5(15), 78–96. https://doi.org/10.48160/25913530di15.170

Issue

Section

Artículos